Key points:

  • The new video instruction will empower contractors to professionally install the PH Insulation’s hinged double leaf refrigeration door

  • PH Insulation is committed to provide necessary training and instructions for the partners’ benefit


PH Insulation, ProfHolod in Russia, has released a new video tutorial for the HVACR industry contractors and cold room owners — how to install the hinged double leaf refrigeration door. The video is in English.

This detailed video guide includes:

  • required tool list

  • step-by-step instructions for installation: from checking the levels to installing the PVC curtain

  • recommendations on how to adjust the door

“When installing the hinged double leaf refrigeration door, it is paramount to pay attention to the accuracy of the door leaf adjustment. The proper adjustment will prolong its service life. The video tutorial shows all the installation steps in detail to help contractors easily install the door in time and on the first try. The video can also be used to train new employees and supervise the contractors.

In PH Insulation we are committed to provide all necessary information to our partners so that they could benefit fromthe most advanced energy safe technologies,” says Rashid Zinatullin, Head of the Technical Solutions and New Developments Department at PH Insulation.

The video is available at PH Insulation’s website in the Technical Documentation section and on our PH Insulation’s YouTube channel. Other video tutorials are available in English and German languages.

For free consultations on installing the doors please contact your personal manager at PH Insulation or request supervision of the installation at www.profholod.com




Sign up to our newsletter

All the most useful and interesting once a week

More news

The quality and safety of the solution combining polyisocyanurate foam and mineral wool have been confirmed
14.07.2026
SIP panels and fire-resistant doors continue to meet regulatory standards
07.07.2026
Limits on the handling of large-tonnage containers have been lifted
23.06.2026
The document has been issued for fire-resistant walls and partitions made of sandwich panels
09.06.2026

See our
projects

gototop