PH Insulation will manufacture standard products for construction of prefabricated buildings and refrigerating chambers within 10 working days from the date of payment for sandwich panels with PIR Premier, PUR Classic, and mineral wool insulation, multi-purpose PIR Plita® insulation boards, 20 types of refrigeration and industrial doors, including door blocks for refrigerating chambers. 10 days’ lead time apply to products in standard colors and sizes.
PH Insulation maintains minimum production times even during the peak construction season with continual improvements in manufacturing process:
- enhancing the efficiency of 2 automated continuous production lines for sandwich panels at PH Insulation’s industrial site in Schelkovo, 40 km outside Moscow
- availability of necessary raw materials due to the establishment of long-term partnerships with major metal suppliers

PH Insulation can ensure quick order fulfillment times for PIR sandwich panels also by using company’s customized PIR Premier system, which reduces dependence on imported raw material supplies through:
- digitalization of process management
- implementation of lean manufacturing tools
- incoming quality control of raw materials and outgoing quality control of products in the company’s accredited laboratory
Annually, PH Insulation produces over 3 million square meters of sandwich panels with three types of insulation, and more than 9 000 refrigeration and industrial doors. PH Insulation delivers all the insulated products to any location in Russia or abroad by road, rail or sea transport.