PH Insulation has reduced the lead time of sandwich panels for all types of medium and low-temperature refrigerating chambers to 14 calendar days from the date of payment.

Reduced lead times apply to

  • zero waste chambers. Price lists are available on the company's website
  • modular chambers with eccentric locks and the improved door block. Modular chambers can significantly increase installation speed due to a pre-installed door, provide savings on shaped elements and reduce the amount of waste on the construction site
  • non-standard chambers of any kind: with internal partitions, corner cutouts, multiple door blocks, hinged doors inside sliding doors, doors under monorails, with embedded elements inside sandwich panels, and so on

cold_room.jpg

PH Insulation ensures short production times and quality through long-term partnerships with the largest suppliers of metal and raw materials, digitalization of technological processes, quality control in its own accredited laboratory and operation of two continuous and one periodic lines for the production of sandwich panels.

Every year PH Insulation produces more than 3 million square meters of sandwich panels with three types of insulation: PIR Premier, PUR Classic and mineral wool.

Sign up to our newsletter

All the most useful and interesting once a week

More news

The production output in the workshop saw a 37% increase, while labor efficiency surged by 34%
14.03.2024
PH Insulation’s engineering department specialists have conducted tests on plastic pulleys and rollers made by the world leading manufacturers
07.02.2024
PH Insulation launches global sale on all types of refrigeration, swinging and industrial doors
01.02.2024
The sliding gates are suitable for openings up to 3000 mm wide and 5000 mm high
16.01.2024