On the 20th of April, Russian Channel One aired a TV show 'Ideal Repair' with design and repair specialists renovating the Moscow apartment of Olga Mashnaya, legendary Sofia from the famous Russian movie ‘Midshipmen, Go!’

The designers’ idea was to extend the living-room area to the cold winter balcony of the apartment. To achieve this the balcony was first to be made cold-proof. Aiming at thorough thermal insulation the TV crew used ProfHolod’s 50 mm thick PIR Plate enclosed in glass-fibre mat. The insulator was mounted on the floor, walls and ceiling of the balcony. The total insulated area is more than 20 sq. meter, and it took one day to mount the board with glue and special anchors.

The TV show anchor Natalia Barbie, who was watching the repair, appreciated the lightness and constructability of the insulator, as well as it thermal conductivity, durability and ease of installation.

PIR Plate is an all-purpose polyurethane insulator designed to save energy in industrial and residential buildings. PIR Plate allows you to build a flat roof, to build insulated house, cottage, garage, store rooms of your house or an enclosed balcony, to reduce costs of heating supply and air conditioning. Soft face materials provide perfect base for stopping, plastering and other decorative finishing.

ProfHolod offers PIR Plate enclosed in coverings made of glass-fibre mat, paper, foil, film. The insulator is sold in packs of 5 pieces; one pack is enough to insulate 3.6 square meters. PIR Plate heat conductivity factor: 0.020 W/m*K, water absorbability is 2% at max.

The ‘Ideal Repair’ is a TV show covering everything related to finishing and furnishing of people homes and creation of a conformable interior environment.

ProfHolod summons the best global practices to create products for advanced heat control in Russia.

Sign up to our newsletter

All the most useful and interesting once a week

More news

The offer is valid until May 31, 2024 for minimum order of 150 square meters of PIR Plita® Boards

14.05.2024
The fruit storage facility with a capacity of 1 200 tons of products will be put into operation in August 2024
25.04.2024
The production output in the workshop saw a 37% increase, while labor efficiency surged by 34%
14.03.2024

See our
projects

gototop